nerdexam
HP

HPE6-A49 · Question #63

HPE6-A49 Question #63: Real Exam Question with Answer & Explanation

Sign in or unlock HPE6-A49 to reveal the answer and full explanation for question #63. The question stem and answer options stay visible for context.

Question

Refer to the exhibit. A customer has these availability requirements: - loss of one controller with stateful failover and without impact on wireless client connectivity - loss of one core switch without loss of connectivity for any endpoints or APs in the building - loss of any one switch-to-switch or MC-to-switch link without loss of connectivity for any endpoints or APs in the building and with minimal impact on infrastructure functionality loss of any one access switch with minimal impact to wireless client connectivity The exhibit shows the current plan for the topology. Which change should the architect make to the plan to provide better support for the customer availability requirements?

Exhibit

HPE6-A49 question #63 exhibit

Options

  • AUse two 40GbE DACs for the VSF link between the core switches.
  • BAdd VLANs 11 and 15 to the MC connections to ensure both MCs can manage any of the APs.
  • CAdd 120 additional AP licenses, so that each MC can support all the APs even if the other MC
  • DChange the 40GbE DAC on the 5406R switch to a stacking cable with stacking module.

Unlock HPE6-A49 to see the answer

You've previewed enough free HPE6-A49 questions. Unlock HPE6-A49 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full HPE6-A49 Practice