HPE0-S50 Exam Questions
49 real HPE0-S50 exam questions with expert-verified answers and explanations. Page 1 of 1.
- Question #1
A customer has a multi-frame Synergy solution. The customer's Support team recently missed some important alerts in its Composer instance because each pair of Composers resides on...
- Question #3
A customer Synergy solution configuration needs redundant paths to the drives used in the HPE Synergy D3940 storage module. Which component must be redundant to meet the customer's...
- Question #4
A customer has HPE SY 480 modules with two CPUs and 384GB (16GB DIMMS) of memory. The customer needs to double the CPU and memory capacity for java application server. What should...
- Question #5
Refer to the exhibit A customer with the configuration shown attempts to configure a server profile for a now application that requires 20Gb of bandwidth, but the configuration fai...
- Question #6
Using compostable features, what should a Synergy integrator do to resolve high memory utilization to an HPE Synergy compute module?
- Question #7
How can a Synergy integrity increase the efficiency with a Synergy can be provisioned? (Select two.) Use PowerShell to automate configuration and application of server profiles.
- Question #9
A customer needs to ttach 20 HPE 11B 6G SAS SFF hadr drives to an HPE Synergy 480 Gen9 compute module. The customer needs a fulty redundant storage solution. Which HPE Products the...
- Question #10
A customer needs to collect a support damp from its appliance, but when the customer attempts to save the support dump to a USB drive, no valid USB drive display a available in the...
- Question #11
A Synergy integrator has planned a highly available Synergy compostable fabric with 20Gn interconnect Link Modules. What is the maximum number of SY 480 compute the integrator can...
- Question #12
Refer to the exhibit Based on the Synergy configuration shown. What will be the outcome in the event of an end-of-row (EoR) switch failure?
- Question #13
Refer to the exhibit. A customer has a Synergy 2-frame design, as shown above. Due to expanding business needs, the customer ordered a third frame to expend the environment 1to a 3...
- Question #15
Refer to the exhibit. A customer has an HPE Synergy frame configuration as Shown. The customer has a new project and needs to increase the number of compute modules. What is the ma...
- Question #16
Refer to the exhibit. How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
- Question #17
While troubleshooting a hardware issue, a Synergy integrator needs to provide HPE Support with a new support dump. What must the integrator be aware of when generating a support du...
- Question #18
A customer has a single frame with seven compute modules in bays 1-7. The customer has an HPE Synergy 12Gb SAS should Module in slot 1. The customer recently made a change require...
- Question #19
A customer needs a consolidated infrastructure view for HPE Synergy and HPE BladeSystem c7000 enclosures. Which approach should the Synergy integrator take to meet the customer's n...
- Question #20
Which utility compares currently running firmware with the upgrade firmware for the HPe Synergy FB Switch Module. Which allows minimal downtime during the aggrade?
- Question #21
A customer has the following requirements for an HPE Synergy solution: * Data for the internal application needs to be stored in the frame. * Compute modules needs to have access t...
- Question #22
A customer is using HPE Synergy Composer to manage the compute module and 3PAR volume attachments: The database attachment to VMware servers has run out of space. What is the most...
- Question #23
in a 3-frame HPE Synergy environment, how should a synergy integrator place the image Streamer modules to allow redundancy to all the management connections?
- Question #26
A customer that uses a third-party array plans to set up Fiber Channel (FC) with the new HPE Synergy 12000 Frame. Which tool creates the FC zones in a Synergy solution?
- Question #28
A synergy integration creating a network that must be connected from the Synergy Connect SE 40Gb FB module to an Ethernet switch carrying 500 VLANs for the hypervisor cluster. Whic...
- Question #29
How should a synergy integrator configure an HPE Synergy solution to provide shared storage to all compute nodes in a single frame?
- Question #30
A Synergy integration needs a supported approach to upgrade HPE drivers on HPE Synergy Modules that run VMware ESX. Which resource should the Synergy integrator use?
- Question #31
A Synergy integration is unable to assign an HPE 3PAR virtual volume to a new profile in HPE OneView. The Virtual Volume has been previously assigned to another profile. Which sett...
- Question #32
As part of a synergy implantation synergy integration needs to create 100 networks in a Logical Interconnect Group (LIG) configuration. The network administration for the end-of-ro...
- Question #33
Which composer of the HPE Synergy solution provides a customer with the ability to rapidly provision a consistent operation environment?
- Question #34
When should IP address be assigned using an IPv6 address pool in the Composer? (Select two.)
- Question #35
A customer reports that performance is not adequate for an application using a hybrid HPE StoreVirtual VS
- Question #36
A Synergy Integrator is configuring an HPE Synergy environment with two HPE Connect 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches...
- Question #38
Refer to Exhibit. A Synergy integrator performs an HPE OneView Composer factory reset. The error message shown displays during an attempts to connect to HPE Synergy Composer for VN...
- Question #39
A Synergy integrator is expanding a customer's HPE Synergy solution. The existing solution includes: * two HPE Synergy 12000 Frames * two HPE Virtual Connect SE 40GB F8 modules. *...
- Question #40
A customer needs to expand a single-frame Synergy solution for two frames. What should the synergy integrator do to establish a proper management network for the two frames?
- Question #41
A customer needs an HPE Synergy slution with the following requiremnts: Based on the design shown, which customer requirement has NOT been met?
- Question #42
Where can a Synergy integrator find consolidated information describing environment requirements, configuration scenarios, and installation preparation needs for the HPE Synergy so...
- Question #44
Refer to the exhibit. A synergy integrator is setting up a highly available 3-frame solution. The integrator the Logical Integrator Groups (LIGs) as shown . While creating the encl...
- Question #45
A customer needs increased available bandwidth and highly available network between Virtual Connect Interconnects. Which two steps must the Synergy integrator perform in the config...
- Question #46
A Synergy7 integrator is modify the network uplink configuration of a Synergy environment that uses HPE Synergy 40GB F8 Switch Modules for Connectivity. What must the Synergy integ...
- Question #47
A customer has moved a USB bootable drive to another compute module but the compute module fails to boot from the USB device. What should the Synergy integrator do to resolve this...
- Question #48
What should a Synergy integrator do to unresponsive HPE Synergy Link Module?
- Question #49
Which element of the Synergy 12000 Frame protects against an the MGMT ports that are connected to the external management network?
- Question #50
A Synergy integrator is working with a customer to perform a first-time setup of a 3-frame Synergy environment: The following modules are installed:
- Question #51
A customer has forgotten the password to the HPE Oneview Appliance controlling the customer HPE synergy infrastructure. Where cans the customer reset the password with the assistan...
- Question #52
A Synergy integrator needs to add more to a server profile. What does the integrator need to be aware of performing this action?
- Question #54
A customer is unable to boot to a 3.5TB volume created and presented to a compute node. What is likely preventing the boot?
- Question #57
A customer needs four Synergy compute nodes to provide virtual machine access to six VLANs over a single link aggregation group. How can the Synergy integrator configure the enviro...
- Question #58
Which component of the HPE Synergy solution enables fast OS deployments to compute modules?
- Question #59
Using a laptop, how can the Synergy integrator perform the initial setup on an HPE 12000 Frame?
- Question #60
A customer is planning an HPE Synergy solution with 20 frames an needs to minimize the number of management ports that are required to connect the frames into the existing manageme...