HP
HPE0-S50 · Question #45
HPE0-S50 Question #45: Real Exam Question with Answer & Explanation
Sign in or unlock HPE0-S50 to reveal the answer and full explanation for question #45. The question stem and answer options stay visible for context.
Question
A customer needs increased available bandwidth and highly available network between Virtual Connect Interconnects. Which two steps must the Synergy integrator perform in the configuration to meet the customer needs? (Select two.)
Options
- ALink Ports L1 and L4 on Master LCMs to port L1 and L2 on the first Satellite ICM.
- BInstall Redundant Frame Link Modules and a second management ring.
- CEnable Multimode Link Aggregation Group (MLAG).
- DEnable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.
- EConnect ports Q7 and Q8 master interconnect Modules (ICM).
Unlock HPE0-S50 to see the answer
You've previewed enough free HPE0-S50 questions. Unlock HPE0-S50 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.