HP
HPE0-S50 · Question #45
A customer needs increased available bandwidth and highly available network between Virtual Connect Interconnects. Which two steps must the Synergy integrator perform in the configuration to meet…
The correct answer is B. Install Redundant Frame Link Modules and a second management ring. E. Connect ports Q7 and Q8 master interconnect Modules (ICM). See the full explanation below for the reasoning.
Question
A customer needs increased available bandwidth and highly available network between Virtual Connect Interconnects. Which two steps must the Synergy integrator perform in the configuration to meet the customer needs? (Select two.)
Options
- ALink Ports L1 and L4 on Master LCMs to port L1 and L2 on the first Satellite ICM.
- BInstall Redundant Frame Link Modules and a second management ring.
- CEnable Multimode Link Aggregation Group (MLAG).
- DEnable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.
- EConnect ports Q7 and Q8 master interconnect Modules (ICM).
How the community answered
(54 responses)- A17% (9)
- B70% (38)
- C7% (4)
- D6% (3)
Community Discussion
No community discussion yet for this question.