HP
HPE0-S50 · Question #36
A Synergy Integrator is configuring an HPE Synergy environment with two HPE Connect 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all…
The correct answer is A. Cross Connect the Volume Connect modules to the upstream switch and select all four 40Gb ports. See the full explanation below for the reasoning.
Question
A Synergy Integrator is configuring an HPE Synergy environment with two HPE Connect 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all compute modules to share the full 160Gb of available bandwidth. The upstream are interconnected in a virtual port channel (vPC) pair. What should the integrator do to ensure that the switch configuration doe not result in a network loop?
Options
- ACross Connect the Volume Connect modules to the upstream switch and select all four 40Gb ports
- BCreate two separate Virtual Connect uplinks Select two ports from each module fro each uplink.
- CCross connect the Virtual Connect modules to the upstream switches and select all four 40Gb
- DCreate two separate Virtual Connect uplinks. Select one part from each module for each uplink.
How the community answered
(39 responses)- A74% (29)
- B5% (2)
- C15% (6)
- D5% (2)