Refer to the Exhibit. You are troubleshooting High Load activities on two consistency groups (CGs). As part of your tasks, you have run the data collect and are reviewing the system log files for…

The correct answer is A. The preferred RPA has lost communications with the remote RPA and caused a failover of the CG. See the full explanation below for the reasoning.

Question

Refer to the Exhibit. You are troubleshooting High Load activities on two consistency groups (CGs). As part of your tasks, you have run the data collect and are reviewing the system log files for the CGs. What is a possible root cause for this High Load period?

Exhibit

E22-275 question #95 exhibit

Options

  • AThe preferred RPA has lost communications with the remote RPA and caused a failover of the CG
  • BThe local site has lost connectivity to the remote site and caused the CG to go into Marking mode.
  • CThere is no journal assigned to the CG in the local site, causing latency build up during data transfer.
  • DThe copies are cross-connected between the sites causing additional I/O to flood the connectivity

How the community answered

(17 responses)
  • A
    71% (12)
  • B
    6% (1)
  • C
    6% (1)
  • D
    18% (3)