Which of the following measures is increased when process performance is improved?
The correct answer is B. Capability index. Capability index (Cp or Cpk) directly quantifies how well a process fits within specification limits, so when performance improves - through reduced variation or better centering - the index value rises. A Cpk of 1.33 is considered capable; improving the process pushes that…
Question
Which of the following measures is increased when process performance is improved?
Options
- AVariability range
- BCapability index
- CRepeatability index
- DSpecification limits
How the community answered
(31 responses)- A3% (1)
- B94% (29)
- C3% (1)
Explanation
Capability index (Cp or Cpk) directly quantifies how well a process fits within specification limits, so when performance improves - through reduced variation or better centering - the index value rises. A Cpk of 1.33 is considered capable; improving the process pushes that number higher.
Why the distractors are wrong:
- A (Variability range): Improved processes produce less variation, so the variability range decreases, not increases.
- C (Repeatability index): Repeatability belongs to measurement system analysis (Gauge R&R), not process performance improvement - it measures instrument/operator consistency, not process output.
- D (Specification limits): Spec limits are set by the customer or design team, not by process performance. They stay fixed regardless of how well you improve the process.
Memory tip: Think of Cpk as a "process report card" - just like a student's GPA goes up when they perform better, the capability index goes up when the process performs better.