C_TSCM42_66 · Question #49

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials…

The correct answer is D. Set the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP. See the full explanation below for the reasoning.

Question

An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon. Which procedure do you recommend for setting the planning horizon?

Options

  • ASet the planning horizon in the MRP groups in Customizing and store deviant entries in the material
  • BSet the planning horizon in the plant parameters in Customizing and store deviant entries in the material
  • CSet the planning horizon in the MRP groups and assign deviant entries via the plant parameter settings in
  • DSet the planning horizon in the plant parameters in Customizing and assign deviant entries via the MRP

How the community answered

(42 responses)
  • A
    5% (2)
  • B
    2% (1)
  • C
    10% (4)
  • D
    83% (35)