C2010-555 · Question #119

C2010-555 Question #119: Real Exam Question with Answer & Explanation

Sign in or unlock C2010-555 to reveal the answer and full explanation for question #119. The question stem and answer options stay visible for context.

Question

A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?

Options

  • ACreate a master PM and link to the characteristic on the Related Records tab.
  • BCreate a condition monitoring point and specify the PM on the upper or lower limit.
  • CCreate a PM against the asset and specify the meter on the Frequency tab of the PM.
  • DCreate an escalation based on the characteristic meter and trigger the PM via an action.

Unlock C2010-555 to see the answer