C2010-555 · Question #119
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
The correct answer is B. Create a condition monitoring point and specify the PM on the upper or lower limit. ftp://ftp.software.ibm.com/software/tivoli_support/misc/STE/2012_08_23_STE_Preventive_Mainte nance_and_Condition_Monitoring.pdf
Preventive Maintenance
Question
A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?
Options
- ACreate a master PM and link to the characteristic on the Related Records tab.
- BCreate a condition monitoring point and specify the PM on the upper or lower limit.
- CCreate a PM against the asset and specify the meter on the Frequency tab of the PM.
- DCreate an escalation based on the characteristic meter and trigger the PM via an action.
How the community answered
(46 responses)- A4% (2)
- B70% (32)
- C7% (3)
- D20% (9)
Explanation
ftp://ftp.software.ibm.com/software/tivoli_support/misc/STE/2012_08_23_STE_Preventive_Mainte nance_and_Condition_Monitoring.pdf
Topics
#characteristic meter#condition monitoring#PM trigger#meter-based PM