A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?

The correct answer is B. Create a condition monitoring point and specify the PM on the upper or lower limit. ftp://ftp.software.ibm.com/software/tivoli_support/misc/STE/2012_08_23_STE_Preventive_Mainte nance_and_Condition_Monitoring.pdf

Preventive Maintenance

Question

A company wants to trigger a PM based on a characteristic type meter. How can this be accomplished?

Options

  • ACreate a master PM and link to the characteristic on the Related Records tab.
  • BCreate a condition monitoring point and specify the PM on the upper or lower limit.
  • CCreate a PM against the asset and specify the meter on the Frequency tab of the PM.
  • DCreate an escalation based on the characteristic meter and trigger the PM via an action.

How the community answered

(46 responses)
  • A
    4% (2)
  • B
    70% (32)
  • C
    7% (3)
  • D
    20% (9)

Explanation

ftp://ftp.software.ibm.com/software/tivoli_support/misc/STE/2012_08_23_STE_Preventive_Mainte nance_and_Condition_Monitoring.pdf

Topics

#characteristic meter#condition monitoring#PM trigger#meter-based PM