Question
A user wishes to perform the same work tasks on several assets simultaneously. How can this be configured?
Options
- AA Route should be created with each stop being one Asset and the Job Plan associated with the
- BA Master Job Plan should be created with Tasks for each Asset.
- CA Work Order Hierarchy should be created against the same Job Plan used for all stops.
- DThe Assets should be specified on the Multiple Assets, Locations and CIs table on the Work