nerdexam
Cisco

500-440 · Question #43

When you deploy Cisco Unified CCE on Cisco UCS C-Series Servers, which statement about the connectivity of the upstream switches is true?

The correct answer is B. You can connect to two or more Layer 2 upstream switches. Option B is correct because Cisco Unified CCE on UCS C-Series Servers is designed for redundancy and high availability - you can connect to two or more Layer 2 upstream switches, which provides fault tolerance through multiple uplinks and eliminates single points of failure in…

Design Cisco Unified CCE Deployment

Question

When you deploy Cisco Unified CCE on Cisco UCS C-Series Servers, which statement about the connectivity of the upstream switches is true?

Options

  • AYou can connect the Cisco UCS C-Series Servers to stacked Layer 2 switches (having multiple
  • BYou can connect to two or more Layer 2 upstream switches.
  • CYou can connect to only one Layer 2 upstream switch per Cisco UCS C-Series Server.
  • DCisco UCS C-Series Server does not support Layer 2 upstream switches.

How the community answered

(60 responses)
  • A
    7% (4)
  • B
    90% (54)
  • C
    2% (1)
  • D
    2% (1)

Explanation

Option B is correct because Cisco Unified CCE on UCS C-Series Servers is designed for redundancy and high availability - you can connect to two or more Layer 2 upstream switches, which provides fault tolerance through multiple uplinks and eliminates single points of failure in the switching layer.

Why the distractors are wrong:

  • A is incorrect because stacked Layer 2 switches present a single point of failure risk; Cisco's validated design specifically recommends separate upstream switches, not a stacked configuration.
  • C is incorrect because limiting connectivity to only one upstream switch per server would create a single point of failure, directly contradicting the HA requirements of a contact center platform.
  • D is incorrect because UCS C-Series absolutely supports Layer 2 upstream switches - this is a standard and required part of the deployment architecture.

Memory tip: Think "CCE = Carrier-grade, so it needs redundancy everywhere." The "two or more" in option B is your signal - contact center infrastructure always demands multiple paths, so any answer suggesting a single upstream switch or no support at all should be eliminated immediately.

Topics

#CCE deployment#UCS C-Series#Switch redundancy#Layer 2 connectivity

Community Discussion

No community discussion yet for this question.

Full 500-440 Practice