500-440 · Question #41
Which setup is correct when you configure Cisco UCS B-Series VICs (M81KR/12xx VICs) for Cisco Unified Contact Center Enterprise on Cisco UCS B-Series deployments?
The correct answer is B. Disable the Fabric Failover option. Disabling Fabric Failover (option B) is the Cisco-validated requirement for Unified CCE deployments on UCS B-Series with M81KR/12xx VICs because the automatic failover mechanism can cause MAC address shifts and perceived link flaps that destabilize UCCE's stateful…
Question
Which setup is correct when you configure Cisco UCS B-Series VICs (M81KR/12xx VICs) for Cisco Unified Contact Center Enterprise on Cisco UCS B-Series deployments?
Options
- AEnable Fabric Failover as an extra redundancy measure so that traffic from the UCS B-Series
- BDisable the Fabric Failover option.
- CDisregard this option because either mode is fine with Cisco Unified CCE on UCS B-Series
- DEnable this Fabric Failover when the connected upstream network is operating in a Common
- EDisable this Fabric Failover when the connected upstream network is operating in a Disjointed
How the community answered
(40 responses)- A8% (3)
- B88% (35)
- C3% (1)
- E3% (1)
Explanation
Disabling Fabric Failover (option B) is the Cisco-validated requirement for Unified CCE deployments on UCS B-Series with M81KR/12xx VICs because the automatic failover mechanism can cause MAC address shifts and perceived link flaps that destabilize UCCE's stateful call-processing components - UCCE manages its own redundancy and does not tolerate unexpected mid-session fabric switches.
Why the distractors fail:
- A sounds like a safety net but is precisely the problem - enabling Fabric Failover introduces the disruption UCCE cannot handle.
- C is wrong because the two modes are not equivalent for UCCE; the choice has documented impact on call-center stability.
- D & E attempt to make the answer conditional on upstream Layer 2 topology (Common vs. Disjointed domain), which is relevant for some workloads but irrelevant here - for UCCE the answer is unconditional: always disable.
Memory tip: Think "CCE = No FO." Contact Center Enterprise owns its own redundancy; letting the VIC do automatic fabric failover behind UCCE's back causes chaos. When in doubt, disable it and let the application layer handle recovery.
Topics