nerdexam
Cisco

300-620 · Question #360

A Cisco ACI fabric must be integrated with a VMware vSphere environment. One of the ESXi hosts is still disconnected from the Distributed Virtual Switch (DVS) and the VMM domain. Two EPGs have already

Sign in or unlock 300-620 to reveal the answer and full explanation for question #360. The question stem and answer options stay visible for context.

ACI Integrations

Question

A Cisco ACI fabric must be integrated with a VMware vSphere environment. One of the ESXi hosts is still disconnected from the Distributed Virtual Switch (DVS) and the VMM domain. Two EPGs have already been created and associated with the VMM domain. An engineer must prepare the ACI configuration such that:

  • EPG contracts must be sent to ACI leaf switches before a hypervisor

is attached to the DVS.

  • EPG contracts must be pushed to leaf hardware as soon as the policy

is downloaded into the leaf software. Which EPG configuration must be used to meet these requirements?

Options

  • AResolution immediacy: Pre-provision
  • BResolution immediacy: Pre-provision
  • CResolution immediacy: On-Demand
  • DResolution immediacy: On-Demand

Unlock 300-620 to see the answer

You've previewed enough free 300-620 questions. Unlock 300-620 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Topics

#VMM integration#Resolution immediacy#Deployment immediacy#EPG contracts
Full 300-620 Practice