Refer to the exhibit. An engineer must divert the traffic between VM-1 and VM-2 by using a Multi- Node service graph. The solution should prevent an insufficient number of available Layer 4 to Layer…

The correct answer is A. PBR node tracking. infrastructure/white-paper-c11-739971.html#Optionalfeatures

ACI Integrations

Question

Refer to the exhibit. An engineer must divert the traffic between VM-1 and VM-2 by using a Multi- Node service graph. The solution should prevent an insufficient number of available Layer 4 to Layer 7 devices in the first cluster. Which configuration set accomplishes this goal?

Exhibit

300-620 question #165 exhibit

Options

  • APBR node tracking
  • BPBR node tracking
  • CPBR node tracking
  • DPBR node tracking

How the community answered

(31 responses)
  • A
    84% (26)
  • B
    10% (3)
  • C
    6% (2)

Explanation

infrastructure/white-paper-c11-739971.html#Optionalfeatures

Topics

#service graph#PBR#Multi-Node service graph#L4-L7 device redundancy