nerdexam
Cisco

300-620 · Question #254

Refer to the exhibit. A load balancer is connected to the Cisco ACI fabric using a single interface. The load balancer is performing source and destination NAT. A service graph is configured on the…

The correct answer is A. Apply PBR on contract between the load balancer and application EPGs. infrastructure/white-paper-c11-739971.html

ACI Integrations

Question

Refer to the exhibit. A load balancer is connected to the Cisco ACI fabric using a single interface. The load balancer is performing source and destination NAT. A service graph is configured on the Cisco ACI. Which action must be taken to allow traffic from host A to pass through the load balancer before reaching host B?

Exhibit

300-620 question #254 exhibit

Options

  • AApply PBR on contract between the load balancer and application EPGs.
  • BDisable unicast routing on the bridge domain BD_2.
  • CConfigure limit IP learning to subnet on BD_3.
  • DSet the default gateway for host B on the load balancer.

How the community answered

(36 responses)
  • A
    83% (30)
  • B
    6% (2)
  • C
    3% (1)
  • D
    8% (3)

Explanation

infrastructure/white-paper-c11-739971.html

Topics

#Service graph#Policy-based redirect (PBR)#Load balancer#Traffic steering

Community Discussion

No community discussion yet for this question.

Full 300-620 Practice