Refer to the exhibit. A load balancer is connected to the Cisco ACI fabric using a single interface. The load balancer is performing source and destination NAT. A service graph is configured on the…
The correct answer is A. Apply PBR on contract between the load balancer and application EPGs. infrastructure/white-paper-c11-739971.html
ACI Integrations
Question
Refer to the exhibit. A load balancer is connected to the Cisco ACI fabric using a single interface. The load balancer is performing source and destination NAT. A service graph is configured on the Cisco ACI. Which action must be taken to allow traffic from host A to pass through the load balancer before reaching host B?
Exhibit
Options
- AApply PBR on contract between the load balancer and application EPGs.
- BDisable unicast routing on the bridge domain BD_2.
- CConfigure limit IP learning to subnet on BD_3.
- DSet the default gateway for host B on the load balancer.
How the community answered
(36 responses)- A83% (30)
- B6% (2)
- C3% (1)
- D8% (3)
Explanation
infrastructure/white-paper-c11-739971.html
Topics
#Service graph#Policy-based redirect (PBR)#Load balancer#Traffic steering