Cisco
300-620 · Question #160
300-620 Question #160: Real Exam Question with Answer & Explanation
Sign in or unlock 300-620 to reveal the answer and full explanation for question #160. The question stem and answer options stay visible for context.
Question
A network engineer configures the Cisco ACI fabric to connect to vCenter with these requirements: - Port groups must be automatically created on the distributed virtual switch. - Port groups must use the VLAN allocation in the range between 20-30. - The deployment must optimize the CAM space on the leaf switches. Which set of actions meets these criteria?
Options
- ACreate a dynamic VLAN pool with the VLAN range of 20-30.
- BCreate a dynamic VLAN pool with the VLAN range of 20-30.
- CCreate a static VLAN pool with the VLAN range of 20-30.
- DCreate a static VLAN pool with the VLAN range of 20-30.
Unlock 300-620 to see the answer
You've previewed enough free 300-620 questions. Unlock 300-620 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.