1Z0-902 · Question #29
1Z0-902 Question #29: Real Exam Question with Answer & Explanation
Sign in or unlock 1Z0-902 to reveal the answer and full explanation for question #29. The question stem and answer options stay visible for context.
Question
A new Exadata Quarter Rack with 2 Database Servers and 3 HC Storage Servers and 3-phase 15kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU. Which statement is correct?
Options
- AThe installation can go ahead, no change is required.
- BThe installation cannot proceed until two power feeds are available per PDU.
- CA splitter cable can be used to provide power to all PDU cables.
- DThe power cables from the servers to the PDUs can be rearranged inside the rack following OECA