1Z0-902 · Question #19
1Z0-902 Question #19: Real Exam Question with Answer & Explanation
Sign in or unlock 1Z0-902 to reveal the answer and full explanation for question #19. The question stem and answer options stay visible for context.
Question
An Exadata X9M-2 Elastic Rack with 4 Database Servers and 8 HC Storage Servers and 3-phase 24kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU. Which statement is correct?
Options
- AA splitter cable can be used to provide power to all PDU cables.
- BThe power cables from the servers to the PDUs can be rearranged inside the rack following OECA
- CThe installation cannot proceed until two power feeds are available per PDU.
- DThe installation can go ahead, no change is required.