VMCE2021 · Question #50

A virtual machine has been permanently deleted in production but a replica is running in the Disaster Recovery data center. Which strategy would failback the virtual machine to production while…

The correct answer is C. Restore this VM up-front from a backup and then perform a failback. See the full explanation below for the reasoning.

Question

A virtual machine has been permanently deleted in production but a replica is running in the Disaster Recovery data center. Which strategy would failback the virtual machine to production while saving both recovery time and network utilization?

Options

  • APerform failback through WAN accelerators
  • BManually enable parallel processing for failback operation
  • CRestore this VM up-front from a backup and then perform a failback

How the community answered

(36 responses)
  • A
    6% (2)
  • B
    11% (4)
  • C
    83% (30)