Symantec
ST0-155 · Question #146
Which two pieces of information must be checked to verify the successful completion of a Scheduled Case Backup Job? (Select two.)
The correct answer is C. Verify that the scheduled job log is missing from System > Jobs. D. Verify that the Last Run job time is present for the scheduled job in System > Schedules. See the full explanation below for the reasoning.
Question
Which two pieces of information must be checked to verify the successful completion of a Scheduled Case Backup Job? (Select two.)
Options
- AVerify that the backup is listed in System > Backups.
- BVerify that the scheduled job log is present in System > Jobs.
- CVerify that the scheduled job log is missing from System > Jobs.
- DVerify that the Last Run job time is present for the scheduled job in System > Schedules.
- EVerify the successful completion in the BackupJob.log in System > Logs.
How the community answered
(22 responses)- A5% (1)
- B5% (1)
- C77% (17)
- E14% (3)
Community Discussion
No community discussion yet for this question.