Which of the following is the most complete disaster recovery plan test type, to be performed after successfully completing the Parallel test?

The correct answer is A. Full Interruption test. DR test types range from least to most disruptive in this order: (1) Checklist Review, (2) Structured Walk-Through (Tabletop), (3) Simulation, (4) Parallel Test, (5) Full Interruption Test. A Full Interruption test is the most complete and realistic because the primary site is…

Submitted by tom_us· Apr 18, 2026Incident Response and Recovery

Question

Which of the following is the most complete disaster recovery plan test type, to be performed after successfully completing the Parallel test?

Options

  • AFull Interruption test
  • BChecklist test
  • CSimulation test
  • DStructured walk-through test

How the community answered

(36 responses)
  • A
    92% (33)
  • B
    6% (2)
  • D
    3% (1)

Explanation

DR test types range from least to most disruptive in this order: (1) Checklist Review, (2) Structured Walk-Through (Tabletop), (3) Simulation, (4) Parallel Test, (5) Full Interruption Test. A Full Interruption test is the most complete and realistic because the primary site is actually shut down and all operations are transferred to the alternate/recovery site - exactly as would happen in a real disaster. It is performed last because it carries the highest risk of business disruption. A Parallel test (the step before) runs both sites simultaneously, so there is no risk of losing production; a Full Interruption test removes that safety net.