SK0-004 · Question #778

A technician is installing a new server with redundant power supplies in an ISO-certified datacenter. Which of the following should the technician perform?

The correct answer is B. Connect each power supply to separate power circuits. True redundant power requires each PSU to connect to a separate physical circuit so that a single upstream failure cannot disable both supplies at once.

Server hardware installation and management

Question

A technician is installing a new server with redundant power supplies in an ISO-certified datacenter. Which of the following should the technician perform?

Options

  • ADetermine the maximum power load
  • BConnect each power supply to separate power circuits
  • CConnect each power supply to the UPS
  • DRun a drop cord from an unused outlet and attach the power cords

How the community answered

(57 responses)
  • A
    2% (1)
  • B
    91% (52)
  • C
    2% (1)
  • D
    5% (3)

Why each option

True redundant power requires each PSU to connect to a separate physical circuit so that a single upstream failure cannot disable both supplies at once.

ADetermine the maximum power load

Determining maximum power load is important for capacity planning but does not address how the redundant supplies are connected or whether true circuit-level redundancy exists.

BConnect each power supply to separate power circuitsCorrect

Connecting each redundant power supply to an independent circuit ensures that a circuit breaker trip, PDU failure, or wiring fault on one path does not simultaneously remove power from both supplies. This is a fundamental data center best practice and a requirement in ISO-certified facilities to achieve genuine power path redundancy. Without circuit separation, the redundant PSUs share a single point of failure upstream.

CConnect each power supply to the UPS

Connecting both PSUs to the same UPS creates a single point of failure at the UPS device - if that UPS fails, both power paths are lost simultaneously.

DRun a drop cord from an unused outlet and attach the power cords

Running a drop cord from an unused outlet is an unsafe and non-compliant method that violates ISO datacenter standards and proper power delivery requirements.

Concept tested: Redundant PSU separate circuit configuration