A technician needs to replace a hot swap coolong fan in a server. The server resides at U26 of a 42U rack that is fully populated with servers. The technician is unable to remove the server from the…

The correct answer is C. Server rail kits. Server rail kits allow a rack-mounted server to slide forward out of the rack while remaining powered on and connected, enabling access to hot-swap components like cooling fans without requiring full removal or shutdown.

Server hardware installation and management

Question

A technician needs to replace a hot swap coolong fan in a server. The server resides at U26 of a 42U rack that is fully populated with servers. The technician is unable to remove the server from the rack without powering off the server first. Which of the following should have been installed at the time the server was installed in the rack?

Options

  • AA UPS
  • BCable management arms
  • CServer rail kits
  • DManagement modules

How the community answered

(41 responses)
  • A
    2% (1)
  • B
    2% (1)
  • C
    90% (37)
  • D
    5% (2)

Why each option

Server rail kits allow a rack-mounted server to slide forward out of the rack while remaining powered on and connected, enabling access to hot-swap components like cooling fans without requiring full removal or shutdown.

AA UPS

A UPS provides battery backup to protect against power loss but does not create any physical mechanism to access hot-swap components inside a rack-mounted server.

BCable management arms

Cable management arms route and protect cables during server movement but are a companion accessory to rail kits, not a replacement - they do not allow the server to slide out of the rack on their own.

CServer rail kitsCorrect

Rail kits attach to both the rack posts and the server chassis, creating a sliding mechanism that lets the server extend out of the rack while power and data cables remain connected via cable management arms. Without rail kits installed at the time of rack mounting, the server is fixed in place and must be physically lifted free - which requires disconnecting power - before internal hot-swap components can be accessed. Installing rail kits during initial server installation is the standard practice to preserve live maintenance capability for hot-swap hardware.

DManagement modules

Management modules enable remote hardware monitoring and administration but provide no physical mechanism to slide a server out of a densely populated rack for in-person hot-swap maintenance.

Concept tested: Server rail kit installation for hot-swap component access

Source: https://www.hpe.com/us/en/servers/rack-infrastructure.html

Topics

#server rail kits#rack installation#server hardware#hot-swap

Community Discussion

No community discussion yet for this question.

Full SK0-004 Practice