An administrator needs to run five CAT6 cable runs to a new server. Which of the following steps should the administrator do FIRST?

The correct answer is D. Label both ends of the cables with unique identifiers. Labeling cables before installation is a foundational best practice that ensures each run can be traced and identified throughout and after the installation process.

Server hardware installation and management

Question

An administrator needs to run five CAT6 cable runs to a new server. Which of the following steps should the administrator do FIRST?

Options

  • AInstall the cables into cable trays.
  • BVerify the bend radius of the cables.
  • CBundle the cables with velcro or zip ties.
  • DLabel both ends of the cables with unique identifiers.

How the community answered

(27 responses)
  • A
    4% (1)
  • C
    4% (1)
  • D
    93% (25)

Why each option

Labeling cables before installation is a foundational best practice that ensures each run can be traced and identified throughout and after the installation process.

AInstall the cables into cable trays.

Installing cables into trays is a routing step that occurs after labeling, not before, since unlabeled cables become nearly impossible to trace once installed.

BVerify the bend radius of the cables.

Verifying bend radius is an important physical handling consideration during routing, but it is not the very first step before labeling and installation begins.

CBundle the cables with velcro or zip ties.

Bundling cables with velcro or zip ties is a final cable management step performed after cables are run and labeled, not before.

DLabel both ends of the cables with unique identifiers.Correct

Labeling both ends of each cable with unique identifiers must be done first because once cables are routed through trays, conduits, or bundled together, identifying individual runs becomes extremely difficult or impossible without prior labeling. This step prevents costly re-work and supports future troubleshooting and documentation.

Concept tested: Cable labeling as first step in structured cabling

Source: https://www.tiaonline.org/standards/tia-606/