A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?

The correct answer is B. Restore data to the equipment. This question describes a disaster recovery scenario involving a warm site and asks for the immediate first step to restore critical applications.

Security and disaster recovery

Question

A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?

Options

  • ARun cabling and power to the warm site.
  • BRestore data to the equipment.
  • CTransfer all data tapes over to the warm site.
  • DRestore least critical applications online to test to make sure the site is functioning.

How the community answered

(23 responses)
  • A
    4% (1)
  • B
    74% (17)
  • C
    9% (2)
  • D
    13% (3)

Why each option

This question describes a disaster recovery scenario involving a warm site and asks for the immediate first step to restore critical applications.

ARun cabling and power to the warm site.

Running cabling and power is characteristic of a cold site; a warm site already has infrastructure in place.

BRestore data to the equipment.Correct

A warm site typically has pre-installed hardware and network connectivity, but it requires data to be restored to the equipment before applications can function. Restoring data is the most critical first step to make applications functional after the physical site is ready.

CTransfer all data tapes over to the warm site.

While data tapes might be involved, the primary action is to restore the data to the systems at the warm site, assuming the tapes have already been transported or data is available via other means.

DRestore least critical applications online to test to make sure the site is functioning.

Testing with least critical applications is an important step, but it cannot be done until after data has been restored and applications have been configured on the systems.

Concept tested: Disaster recovery site types and warm site recovery steps

Source: https://learn.microsoft.com/en-us/azure/site-recovery/site-recovery-overview

Topics

#Disaster recovery#Warm site#Data restoration#Business continuity

Community Discussion

No community discussion yet for this question.

Full SK0-003 Practice