nerdexam
SNIA

S10-300 · Question #89

You are tasked with connecting a new pair of hosts to an existing SAN infrastructure. The existing infrastructure is a 2Gb/s Fibre Channel solution on the far side of your facility. What are three…

The correct answer is B. Cable lengths as long as you measure and insure a proper strength signal as measured in DB. C. Patch panels utilizing 50 micron optical cable for the long floor runs and 62.5 micron optical cable D. Re-use of existing Gigabit Ethernet cable infrastructure since Gigabit Ethernet cables have the. See the full explanation below for the reasoning.

Question

You are tasked with connecting a new pair of hosts to an existing SAN infrastructure. The existing infrastructure is a 2Gb/s Fibre Channel solution on the far side of your facility. What are three concerns for the new infrastructure? (Choose three.)

Options

  • AThe measured bit error rate (BER) is between "1 in 10^16" and "1 in 10^15"
  • BCable lengths as long as you measure and insure a proper strength signal as measured in DB.
  • CPatch panels utilizing 50 micron optical cable for the long floor runs and 62.5 micron optical cable
  • DRe-use of existing Gigabit Ethernet cable infrastructure since Gigabit Ethernet cables have the

How the community answered

(24 responses)
  • A
    29% (7)
  • B
    71% (17)

Community Discussion

No community discussion yet for this question.

Full S10-300 Practice