S10-300 · Question #76

An existing SAN is presently deployed that has two arrays (8 FC ports each) and eight Servers (2 FC ports each) two backup servers (4 FC Ports Each) and four FC to SCSI tape routers (2 port each)…

The correct answer is B. An additional pair of switches would be needed to enable this request. See the full explanation below for the reasoning.

Question

An existing SAN is presently deployed that has two arrays (8 FC ports each) and eight Servers (2 FC ports each) two backup servers (4 FC Ports Each) and four FC to SCSI tape routers (2 port each). They presently have two Fabrics each with a single 32 port switch. They wish to add four new servers, one new array, and one new backup server. Which statement is correct?.

Options

  • AThe existing switch infrastructure will handle the expansion.
  • BAn additional pair of switches would be needed to enable this request.
  • CAn additional 3 switches should be ordered to allow conversion of these fabrics to a core-edge
  • DThe added latency of the ISL would require that the backup server would need to be deployed on

How the community answered

(53 responses)
  • A
    6% (3)
  • B
    81% (43)
  • C
    11% (6)
  • D
    2% (1)