RCDD · Question #64
When designing a campus distribution system involving small buildings with only one horizontal cross-connect (HC) [Floor distributor (FD)] per building, you can eliminate the need for a(n):
The correct answer is A. Intermediate cross-connect (IC) Building distributor (BD). In the structured cabling hierarchy, when a small building contains only one horizontal cross-connect (HC/FD), the intermediate cross-connect (IC) or building distributor (BD) level can be eliminated, allowing the FD to connect directly to the campus distributor.
Question
When designing a campus distribution system involving small buildings with only one horizontal cross-connect (HC) [Floor distributor (FD)] per building, you can eliminate the need for a(n):
Options
- AIntermediate cross-connect (IC) Building distributor (BD)
- BMain cross-connect (MC) Campus distributor (CD)
- CHorizontal cross-connect (HC) Floor distributor (FD)
- DEntrance facility (EF)
- ELatching connector (LC)
How the community answered
(26 responses)- A73% (19)
- C8% (2)
- D15% (4)
- E4% (1)
Why each option
In the structured cabling hierarchy, when a small building contains only one horizontal cross-connect (HC/FD), the intermediate cross-connect (IC) or building distributor (BD) level can be eliminated, allowing the FD to connect directly to the campus distributor.
TIA-568 and ISO 11801 permit the elimination of the intermediate cross-connect (IC) - called the building distributor (BD) in ISO terminology - when a building contains only a single horizontal cross-connect (floor distributor). In this scenario, the HC/FD connects directly to the main cross-connect (MC) or campus distributor (CD), simplifying the cabling hierarchy without violating standards requirements.
The main cross-connect (MC) or campus distributor (CD) is the top-level aggregation point for the campus backbone and cannot be eliminated; it is required to interconnect all buildings in the campus distribution system.
The horizontal cross-connect (HC) or floor distributor (FD) is the central premise of this scenario - the building has exactly one - and it cannot be eliminated because it serves as the termination point for horizontal cabling to work areas.
The entrance facility (EF) is required wherever outside plant cables enter a building and cannot be removed from a campus distribution design regardless of building size.
A latching connector (LC) is a fiber optic connector type (small form factor), not a hierarchical cross-connect level in the structured cabling topology, making it irrelevant to this design decision.
Concept tested: Eliminating intermediate cross-connect in single-HC building design
Topics
Community Discussion