BICSI
RCDD-002 · Question #25
RCDD-002 Question #25: Real Exam Question with Answer & Explanation
Sign in or unlock RCDD-002 to reveal the answer and full explanation for question #25. The question stem and answer options stay visible for context.
Question
An ICT distribution designer installed a 50/125 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft). At Building B, the designer fusion splices this new cable to an existing identical 50/125 mm fiber optic cable that runs 800 m (2525 ft) to Building C. Both ends are terminated with SC connectors. What is the loss budget for the above fiber link?
Options
- A2.95 dB
- B3.40dB
- C3.90 dB
- D4.35 dB
Unlock RCDD-002 to see the answer
You've previewed enough free RCDD-002 questions. Unlock RCDD-002 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.