A separate Product Backlog is needed for every: (Choose the best answer)

The correct answer is A. Product. A Product Backlog is an ordered list of what is needed to improve the product. It is the single source of work undertaken by the Scrum Team. The Product Backlog is owned by the Product Owner, who is accountable for maximizing the value of the product resulting from the work of…

Applying Scrum

Question

A separate Product Backlog is needed for every: (Choose the best answer)

Options

  • AProduct.
  • BScrum Team.
  • CPortfolio.
  • DProgram.
  • EAll of the above.

How the community answered

(35 responses)
  • A
    91% (32)
  • B
    6% (2)
  • C
    3% (1)

Explanation

A Product Backlog is an ordered list of what is needed to improve the product. It is the single source of work undertaken by the Scrum Team. The Product Backlog is owned by the Product Owner, who is accountable for maximizing the value of the product resulting from the work of the Scrum Team. Therefore, a separate Product Backlog is needed for every product, not for every Scrum Team, portfolio, program, or all of the above. Multiple Scrum Teams can work on the same product and share the same Product Backlog. A portfolio or a program may consist of multiple products, each with its own Product Backlog.

Topics

#Product Backlog#product scope#Scrum artifacts