NS0-184 · Question #53
You have added two new AFF A250 nodes to an existing 4-node cluster with NetApp CN1610 cluster network switches. Although the nodes can join the cluster, the storage failover show command output…
The correct answer is C. The AFF A250 requires switches with 25GbE port support. D. The AFF A250 uses the same port for the cluster and the HA interconnect. https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardw are_Upgrade%3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_error s_and_cannot_perform_takeover Shows using 25GbE for interconnect switches…
Question
You have added two new AFF A250 nodes to an existing 4-node cluster with NetApp CN1610 cluster network switches. Although the nodes can join the cluster, the storage failover show command output shows that the NVRAM log is not synchronized, and it cannot reach the partner over an HA interconnect. In this scenario, which two statements are true? (Choose two.)
Options
- AThe AFF A250 requires switches with 40GbE port support.
- BThe AFF A250 uses different ports for the cluster and the HA interconnect.
- CThe AFF A250 requires switches with 25GbE port support.
- DThe AFF A250 uses the same port for the cluster and the HA interconnect.
How the community answered
(27 responses)- A11% (3)
- B19% (5)
- C70% (19)
Explanation
https://kb.netapp.com/Advice_and_Troubleshooting/Flash_Storage/AFF_Series/Controller_Hardw are_Upgrade%3A_Adding_AFF_A250_nodes_to_existing_cluster_report_HA_interconnect_error s_and_cannot_perform_takeover Shows using 25GbE for interconnect switches https://docs.netapp.com/us-en/ontap-systems/a250/install-detailed-guide.html#required-cabling- cable-controllers-to-a-cluster
Topics
Community Discussion
No community discussion yet for this question.