Network_Appliance
NS0-184 · Question #21
You are expanding an existing cluster that uses BES-53248 cluster interconnect switches. You connected the new controllers to ports 0/17 through 0/20. However, you are unable to join the new nodes…
The correct answer is A. Install the license file. https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/configure-reqs- bes53248.html#configuration-requirements
Maintenance and troubleshooting
Question
You are expanding an existing cluster that uses BES-53248 cluster interconnect switches. You connected the new controllers to ports 0/17 through 0/20. However, you are unable to join the new nodes to the cluster. Which action must be taken to solve the problem?
Options
- AInstall the license file.
- BInstall the CSHM configuration file.
- CInstall the reference configuration file.
- DReboot the controllers.
How the community answered
(18 responses)- A78% (14)
- B11% (2)
- C6% (1)
- D6% (1)
Explanation
https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/configure-reqs- bes53248.html#configuration-requirements
Topics
#BES-53248#cluster interconnect#switch license#port expansion
Community Discussion
No community discussion yet for this question.