Network_Appliance
NS0-184 · Question #51
NS0-184 Question #51: Real Exam Question with Answer & Explanation
Sign in or unlock NS0-184 to reveal the answer and full explanation for question #51. The question stem and answer options stay visible for context.
Question
You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF. In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)
Options
- ALoad the Storage RCF.
- BCable the AFF A250 nodes to the next free ports on the switch.
- CCable the AFF A250 nodes to the breakout ports on the switch.
- DLoad the Cluster-HA-Breakout RCF.
Unlock NS0-184 to see the answer
You've previewed enough free NS0-184 questions. Unlock NS0-184 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.