nerdexam
Network_Appliance

NS0-184 · Question #51

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF. In this…

The correct answer is C. Cable the AFF A250 nodes to the breakout ports on the switch. D. Load the Cluster-HA-Breakout RCF. https://mysupport.netapp.com/site/info/cisco-ethernet-switch https://docs.netapp.com/us-en/ontap-metrocluster/install-ip/port_usage_3232c_9336c.html

ONTAP installation and initial setup

Question

You are preparing to add a 2-node AFF A250 system to an existing 4-node AFF A800 cluster with Cisco Nexus 3232C switches. The cluster switches are currently running the Cluster-HA RCF. In this scenario, which two steps are required to install the AFF A250 system? (Choose two.)

Options

  • ALoad the Storage RCF.
  • BCable the AFF A250 nodes to the next free ports on the switch.
  • CCable the AFF A250 nodes to the breakout ports on the switch.
  • DLoad the Cluster-HA-Breakout RCF.

How the community answered

(48 responses)
  • A
    8% (4)
  • B
    21% (10)
  • C
    71% (34)

Explanation

https://mysupport.netapp.com/site/info/cisco-ethernet-switch https://docs.netapp.com/us-en/ontap-metrocluster/install-ip/port_usage_3232c_9336c.html

Topics

#cluster expansion#Nexus 3232C#breakout ports#RCF file

Community Discussion

No community discussion yet for this question.

Full NS0-184 Practice