Network_Appliance
NS0-184 · Question #34
You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses…
The correct answer is B. Reload the RCF file D. Reload the switch. https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/replace-install- rcf.html#reset-the-broadcom-ip-switch-to-factory-defaults
ONTAP installation and initial setup
Question
You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses are installed. Which two additional steps must be taken to bring the additional ports online? (Choose two.)
Options
- AReload the firmware
- BReload the RCF file
- CRe-enable each port
- DReload the switch
How the community answered
(40 responses)- A8% (3)
- B75% (30)
- C18% (7)
Explanation
https://docs.netapp.com/us-en/ontap-systems-switches/switch-bes-53248/replace-install- rcf.html#reset-the-broadcom-ip-switch-to-factory-defaults
Topics
#BES-53248 cluster switch#RCF file#port activation#switch reload
Community Discussion
No community discussion yet for this question.