NCP-MCI-6.10 · Question #122
An administrator was tasked with configuring a Nutanix Disaster Recovery solution and has established synchronous replication between the sites. For additional resiliency, each site is running its…
The correct answer is B. Conduct a planned failover from the standby site. For a planned maintenance event, the administrator should use a planned failover - not an unplanned one - because the primary site is still operational and workloads can be gracefully migrated with minimal data loss. Conducting a planned failover from the standby site (B) is…
Question
An administrator was tasked with configuring a Nutanix Disaster Recovery solution and has established synchronous replication between the sites. For additional resiliency, each site is running its own Prism Central instance managing the local AHV cluster. An administrator was notified that a failover is required for a planned datacenter maintenance on the primary site. In which two ways should the administrator proceed? (Choose two.)
Options
- APerform on-demand live migration between the clusters.
- BConduct a planned failover from the standby site.
- CConduct an unplanned failover from the primary site.
- DConduct a planned failover from the primary site
How the community answered
(56 responses)- A13% (7)
- B80% (45)
- C5% (3)
- D2% (1)
Explanation
For a planned maintenance event, the administrator should use a planned failover - not an unplanned one - because the primary site is still operational and workloads can be gracefully migrated with minimal data loss. Conducting a planned failover from the standby site (B) is valid because the standby Prism Central, managing the recovery AHV cluster, can initiate a planned failover once synchronous replication ensures zero RPO. Conducting a planned failover from the primary site (D) is also valid - while the primary is still up, the admin can initiate the failover to gracefully move workloads to the standby site before maintenance begins. On-demand live migration (A) is more commonly used for non-DR, same-network migration. Unplanned failover (C) is reserved for unexpected outages and should not be used for a scheduled maintenance window, as it implies the primary is already down or unreachable.
Topics
Community Discussion
No community discussion yet for this question.