NACE-CIP2-001 · Question #71

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non…

The correct answer is C. Consult your supervisor. You've hit your limit · resets 5am (America/New_York)

Inspection Procedures

Question

You are working as the only in-house NACE Level 2 Inspector in a shop setting when an independent 3rd party NACE Level 3 Inspector, representing the owner, presents you with a copy of a Non Conformance Report (NCR) he has written for a NACE2/SSPC SP 10 centrifugal blast which you had previously approved. Your FIRST preferred course of action is to:

Options

  • AVerbally challenge the NCR
  • BRequest a re-blast of the item in question
  • CConsult your supervisor
  • DReview the NCR with the other Inspector

How the community answered

(41 responses)
  • A
    5% (2)
  • B
    15% (6)
  • C
    73% (30)
  • D
    7% (3)

Explanation

You've hit your limit · resets 5am (America/New_York)

Topics

#non-conformance report#NCR protocol#inspector conflict resolution#SSPC SP10