NACE-CIP2-001 · Question #2
You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal blast unit is being used to blast the tank floor to a NACE No.1/SSPC SP 5. The Contractor has completed his…
The correct answer is B. Review the standard with the Contractor and re-inspect the floor. You've hit your limit · resets 5am (America/New_York)
Question
You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal blast unit is being used to blast the tank floor to a NACE No.1/SSPC SP 5. The Contractor has completed his final blast and has called for a hold point inspection. This is the 1st time you have seen field based centrifugal blast cleaning. You observe what appears to be staining on the substrate however the Contractor assures you this is normal when using centrifugal blast units and what you are seeing is what is defined in the standard as an acceptable variation in appearance. Your FIRST preferred course of action is to:
Options
- ARequest that the Contractor re-blast the floor
- BReview the standard with the Contractor and re-inspect the floor
- CShut the job down
- DCall your supervisor
How the community answered
(43 responses)- A2% (1)
- B81% (35)
- C12% (5)
- D5% (2)
Explanation
You've hit your limit · resets 5am (America/New_York)
Topics
Community Discussion
No community discussion yet for this question.