N10-009 · Question #162
N10-009 Question #162: Real Exam Question with Answer & Explanation
Sign in or unlock N10-009 to reveal the answer and full explanation for question #162. The question stem and answer options stay visible for context.
Question
Newly crimped 26ft (8m) STP Cat 6 patch cables were recently installed in one room to replace cables that were damaged by a vacuum cleaner. Now, users in that room are unable to connect to the network. A network technician tests the existing cables first. The 177ft (54m) cable that runs from the core switch to the access switch on the floor is working, as is the 115ft (35m) cable run from the access switch to the wall jack in the office. Which of the following is the most likely reason the users cannot connect to the network?
Options
- AMixed UTP and STP cables are being used.
- BThe patch cables are not plenum rated.
- CThe cable distance is exceeded.
- DAn incorrect pinout on the patch cable is being used.
Unlock N10-009 to see the answer
You've previewed enough free N10-009 questions. Unlock N10-009 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.