MB6-703 · Question #59

You have a bill of materials (BOM) item that has several components. You specify the measurements of a BOM component. You need to identify when the measurements of a BOM component are calculated…

The correct answer is C. When a calculation group is linked to the item of a BOM component D. When a calculation is run on the BOM line. See the full explanation below for the reasoning.

Question

You have a bill of materials (BOM) item that has several components. You specify the measurements of a BOM component. You need to identify when the measurements of a BOM component are calculated. What are two possible events that will cause the measurements to be calculated? Each correct answer presents a complete solution.

Options

  • AWhen a cost group is added to the costing sheet
  • BWhen a cost estimation is run in the production order
  • CWhen a calculation group is linked to the item of a BOM component
  • DWhen a calculation is run on the BOM line

How the community answered

(22 responses)
  • A
    9% (2)
  • B
    14% (3)
  • C
    77% (17)