You have a bill of materials (BOM) item that has several components. You specify the measurements of a BOM component. You need to identify when the measurements of a BOM component are calculated…
The correct answer is C. When a calculation group is linked to the item of a BOM component D. When a calculation is run on the BOM line. See the full explanation below for the reasoning.
Question
You have a bill of materials (BOM) item that has several components. You specify the measurements of a BOM component. You need to identify when the measurements of a BOM component are calculated. What are two possible events that will cause the measurements to be calculated? Each correct answer presents a complete solution.
Options
- AWhen a cost group is added to the costing sheet
- BWhen a cost estimation is run in the production order
- CWhen a calculation group is linked to the item of a BOM component
- DWhen a calculation is run on the BOM line
How the community answered
(22 responses)- A9% (2)
- B14% (3)
- C77% (17)