- Question #1
For a Normal Distribution as samples size increases the Range in Mean and Standard Deviation decrease relative to the Mean and Standard Deviation of the population.
- Question #2
Some of the sources for different types of error that can be quantified using Statistical Analysis are ___________________.
- Question #3
Since Normality is required if we intend to use the data collected as a predictive tool. To test for Normality of data we must determine if the P-value is ___________.
- Question #4
The Normal Distribution is considered to be the most important distribution in statistics and, among other things is defined as having a total area under the curve of 1, is mounded...
- Question #5
Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false...
- Question #6
A statistical test or Hypothesis Test is performed to reject or fail to reject a stated hypothesis and it converts the Practical Problem into a Statistical Problem.
- Question #7
The class score distribution of schools in a metropolitan area is shown here along with an analysis output. Comment on the statistical significance between the Means of the two dis...
- Question #8
How many experimental runs exist in a Full Factorial and fully randomized design for 5 factors with 2 replicates for the Corner Points and no Center Points? The factors in the expe...
- Question #9
If an experiment has 5 factors and no replicates for a 2-level Experimental Design with 16 experimental runs which statement(s) are correct? (Note: There are 3 correct answers).
- Question #10
With Measurement System Analysis we are concerned with two issues that impact the potential variability of the data. They are ____________ and Accuracy.
- Question #11
An operator is measuring the distance between two points. Which is most likely to be influenced by the operator?
- Question #12
Accuracy can be assessed in several ways and a fairly accurate means of measurement is visual comparison.
- Question #13
Measurement __________ is defined as the difference between the observed and the expected values for a given set of data.
- Question #14
Appropriate measures means that measurements are ______________.
- Question #15
A ___________ problem in the Measurement System suggests that there is a lack of consistency in the measurement over time.
- Question #16
An operator checks that all boxes being packed contain enough products to fill the box. However, each box getting filled has a different number of products in it. This is a Reprodu...
- Question #17
In a good Measurement System the most variation will be with part-to-part measurements. What should you do if the majority of variation is associated with the Gage R&R assuming the...
- Question #18
What aspects of Measurement Systems Analysis (MSA) studies are applicable when the process used to measure does not damage the part?
- Question #19
Each of the items listed would impact the Process Capability for a process with a continuous output except ___________________.
- Question #20
For Attribute Data, Process Capability is defined as the average proportion of nonconforming products.
- Question #21
The reported Cpk for a process with an average of 104 units, a spread of 18 units and upper and lower specification limits of 122 and 96 units would be?
- Question #22
When we compare short-term and long-term Capability which of these is true?
- Question #23
What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?
- Question #24
Which statements are correct about the advanced Capability Analysis shown here? (Note: There are 3 correct answers).
- Question #25
Relative to a Design of Experiments the term Collinear refers to variables being a ________________ of each other.
- Question #26
The Lean toolbox includes all of the following items except __________.
- Question #27
If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tool...
- Question #28
Kaizens or Kaikakus and Six Sigma projects are intended to create breakthrough, significant process improvement versus minor, incremental improvements.
- Question #29
Using this partial Z Table, how many units from a month's production run are expected to not satisfy customer requirements for the following process? Upper specification limit: 7.2...
- Question #30
Which of these items are not part of what is necessary for successful Kaizens?
- Question #31
For a Kanban to be successful which of these must occur?
- Question #32
Common and Special Cause ______________ are the focus of Statistical Process Control.
- Question #33
If you can Poka-Yoke a defect out of the process entirely then you do not need use SPC on the characteristic of interest in the defect.
- Question #34
Range Charts are the technique used to determine if ______________ are occurring within the subgroups of the SPC Charts.
- Question #35
If a process has subgroups for Variable data and the process runs for a long period of time, then the best pair of SPC Charts to use would be an Xbar and _________.
- Question #36
Six Sigma is a business improvement discipline whose fundamental view is based on a _________ oriented approach of the business.
- Question #37
Much of the Six Sigma methodology is used to identify and remove causes for _____________ .
- Question #38
When variation is removed from the output of a process then the process customer can have more confidence in the experience that results from the process.
- Question #39
The distance between the Mean of a data set and the Point of Inflection on a Normal curve is called the _______________.
- Question #40
One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X's) and is commonly shown as which formula?
- Question #41
When we gather information for the Voice of the Business we are primarily interested in information concerning the _____________ of the business.
- Question #42
When a Belt creates a Process Map she will use a __________________ to depict a decision point requiring a Yes or No decision.
- Question #43
A Belt has determined that the inventory of repair parts at a rework station can be reduced by 45%. According to Cost of Poor Quality (COPQ) definitions inventory reduction would b...
- Question #44
Customers make their decisions based on Features, Integrity (of the seller) Delivery and ___________?
- Question #45
The Hardware Store ordered ten lawn mower from the manufacturer and just before shipping the manufacturer found one to have a motor that wouldn't start. For the manufacturer this w...
- Question #46
Cost of Poor Quality (COPQ) can be classified as Visible Costs and Hidden Costs. All these items are Hidden Cost except __________________.
- Question #47
Which of these are examples of business metrics or Key Performance Indicators commonly referred to as KPI's?
- Question #48
When one speaks of 20% of something contributing 80% of the affect they are referring to what is known as the _________________.
- Question #49
Which of these graphical presentations displays the values of each individual reading?
- Question #50
As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.