Switch-1 has a power issue that causes it to fail. When Switch-1 comes back up, endpoints lose connectivity for a few minutes. The network administrator decides to use this command: Switch-1# vlan 10 vrrp vrid 10 preempt-delay-time 120 Exhibit 2 shows the VRRP configuration just after the change. What is the effect of this change?
Options
- ASwitch-1 and Switch-2 both become Master in their own VRRP virtual router due to the delay timer mismatch. The mismatch must be fixed.
- BSwitch-1 now waits to take over as Master if it fails and recovers. This should prevent the connectivity issues from occurring again.
- CSwitch-1 immediately becomes Master in the VRRP virtual router. This would cause Switch-2 to take over as Master for VLAN 1.
- DSwitch-1 continues to act as it did before the preempt delay time was set. Administrators must plan additional changes to fix the issue.