Question
A company requires distribution layer switches that can provide Layer 2 and Layer 3 redundancy. The exhibit shows the proposal for these switches. Which change to the exhibit is needed to meet the company's requirements?
Options
- AThe proposed switches should be replaced with switches such as the Aruba 2930M to support the backplane stacking technology.
- BVSFM should be implemented instead of backplane stacking to support the Layer 3 redundancy requirements.
- CLink aggregation should be configured with two LACP trunks from the LAPs to redundancy requirements and backplane stacking limitations.
- DThe proposed switches should be replaced with switches that support VSF to support the required distance between stack members.
Unlock HPE6-A45 to see the answer
You've previewed enough free HPE6-A45 questions. Unlock HPE6-A45 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.