Question

A junior architect designed a solution based on HPE Synergy that must meet the following requirements: - Support at least 30 HPE Synergy 480 Gen10 Plus compute modules - Interconnect modules must provide MAC and WWN virtualization - All HPE Synergy frames must formulate a single management entity - The management appliance should not be a single point of failure - Connectivity to FC array should be available to all compute nodes The proposal consists of: - 3 HPE Synergy 12000 frames - 6 HPE Composer 2 modules - 2 HPE Virtual Connect SE 100Gb F32 Module - 4 HPE Synergy 50Gb Interconnect Link Module Which statements about this proposed design are true? (Select two)

Options

  • AFC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.
  • BHPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.
  • CRemove 4 HPE Composer 2 modules from the design, as they are not required.
  • DThe selected interconnect modules do not provide the requested WWN virtualization.
  • EThe current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.

Unlock HPE0-S59 to see the answer