A corporate network has PVST+ configured on all Cisco switches. All uplinks ports are Gigabit Ethernet ports and are configured with the default PVST+ cost (4). You want to change the cost of the…
The correct order of steps is: 1. Change cost of uplink between distribution switches to 5000, 2. Change path cost method to Long on edge switches, 3. Change path cost method to Long on distribution switches, 4. Change cost of uplink between distribution switches to 5000.
Perform Network Infrastructure Migration
Question
A corporate network has PVST+ configured on all Cisco switches. All uplinks ports are Gigabit Ethernet ports and are configured with the default PVST+ cost (4). You want to change the cost of the port using the "path cost method long" in order to have a homogeneous cost structure when you introduce switches running MSTP. You want to avoid causing a change in the PVST+ topology. Place the steps in the correct order to accomplish this. Available steps: Change cost of uplink between distribution switches to 5000, Change path cost method to Long on edge switches, Change path cost method to Long on distribution switches.
Explanation
The correct order of steps is: 1. Change cost of uplink between distribution switches to 5000, 2. Change path cost method to Long on edge switches, 3. Change path cost method to Long on distribution switches, 4. Change cost of uplink between distribution switches to 5000.
Topics
#PVST+ path cost#MSTP migration#path cost method long#spanning tree topology