Question

When planning the network in a sports stadium, there are three main ways to install APs: side installation, ceiling installation, and under-seat installation. Which of the following descriptions of the three installation methods is correct?

Options

  • AWhen installing under the seat, it is necessary to destroy the existing building surface and add
  • BWhen installing the ceiling, the construction cost is higher for the ceiling with simple structure and
  • CWhen installed on the side, the device is installed at a lower position and there is a risk of being
  • DThe transmission between the terminal and AP in the three installation methods is line-of-sight,