- Question #123Enterprise Network Design Methodology
The application information of the customer network should contain application type, quantity of clients using the application, application bandwidth, security, reliability, and re...
application requirementscustomer demand analysisbandwidth planningreliability - Question #124Enterprise Network Design Methodology
Customer network demands usually contain .
customer requirementsdemand analysisWAN connectivitynetwork design - Question #125Enterprise Network Design Methodology
Which of the following descriptions about customer demand analysis is/are correct?
demand analysiscustomer communicationrequirements gatheringproject management - Question #127Enterprise Network Design Methodology
A CPOS interface connects to multiple E1 interfaces through the transmission network. This belongs to .
CPOS interfaceE1 interfaceinterface interworkingWAN interfaces - Question #129High Availability and Reliability Design
The recovery capability of a network topology is different from another. A single point of failure may happen in network.
network topologysingle point of failurestar topologytree topology - Question #131Enterprise Network Design Methodology
Which of the following is/are used in the interconnection address planning for the point-to-point link?
IP addressingpoint-to-point linkssubnet maskaddress planning - Question #132IPv6 Network Design
In the IPv6 NAT-PT technology, to assign an IPv6 address pool on the NAT-PT server to the IPv4 hosts that want to access IPv6 network, the prefix length of addresses in the pool sh...
IPv6 NAT-PTIPv4-IPv6 transitionaddress poolprefix length - Question #133IPv6 Network Design
The 6PE technology can be used to interconnect IPv4 and IPv6 networks.
6PEIPv6 transitionMPLSIPv4-IPv6 interworking - Question #135Network Performance Optimization
The QoS technologies used in the DiffServ service model include .
DiffServQoS mechanismstraffic shapingcongestion management - Question #136Network Performance Optimization
Which of the following QoS designing methods is/are correct?
QoS designtraffic policinghardware queuingDiffServ deployment - Question #137Network Security Design
Which of the following descriptions about security of SNMPv1 and SNMPv2 is correct?
SNMPv1SNMPv2network management securitymessage integrity - Question #139Network Security Design
The position and the direction on the interface where ASPF and packet filtering are employed concurrently should be focused on. Usually, we configure the deny any packet filtering...
ASPFpacket filteringfirewall policystateful inspection - Question #140Network Security Design
Which of the following firewall deployment schemes is preferred when deploying an IPSec VPN for the mobile users?
IPSec VPNfirewall deploymentmobile usersVPN gateway placement - Question #141Network Security Design
The VPN network security design include .
VPN security designtunnel encryptiondata authenticationintrusion detection - Question #142MPLS and VPN Technologies
In the case that the central node of the IPSec VPN uses the VRRP, which of the following methods can be used to avoid long-term interruption of the VPN due to the master device fai...
IPSec VPNVRRPIKE keepaliveDPD - Question #143MPLS and VPN Technologies
Many protocols use the PPP as their upper-layer encapsulation protocol, such as the L2TP and PPPoE. Which of the following PPP advantages is the reason?
PPPL2TPPPPoEauthentication capability - Question #144Enterprise Network Design Methodology
The PPP deployment principles include .
PPP deploymentdial-uppoint-to-point authenticationWAN design - Question #145Enterprise Network Design Methodology
In the case that no dialing module is configured, the AUX port of the mid-end/low-end router can provide dialing access for remote management of the router.
AUX portrouter managementdial-up accessremote management - Question #146Enterprise Network Design Methodology
Which of the following methods can be adopted to configure PPP MP?
PPP multilinkMP GroupVirtual TemplateWAN configuration - Question #147Enterprise Network Design Methodology
Which of the following interfaces can PPP be used on?
PPPserial interfaceWAN encapsulationinterface types - Question #148Enterprise Network Design Methodology
Two servers from two ASs need to access each other. And the route exchange between the two ASs is prohibited. Which of the following should be used?
static NATinter-AS connectivityNAT designroute exchange restriction - Question #149High Availability and Reliability Design
The module-level backup designing is intended to construct module redundancy backup inside a single device by using different physical cards and modules on the basis of the equipme...
module-level backuphardware redundancydevice architectureequipment limitations - Question #150High Availability and Reliability Design
In the asymmetrical backup scheme, the bandwidth provided by the backup link is smaller than or equal to the bandwidth of the main link, and the backup link takes effect only when...
asymmetrical backupbackup link designpolicy routinglink redundancy