FC0-U61 · Question #496
During a power outage, a server with redundant power supplies shuts down despite being connected to a UPS. The technician determines that the UPS has failed and replaces it. The technician then separa
The correct answer is A. Implement preventive measures.. The technician has implemented a preventive measure to avoid the same situation in the future. A plan of action was established way before and consisted in replacing the defective UPS (and possibly already included the change to a double UPS setup).
Question
During a power outage, a server with redundant power supplies shuts down despite being connected to a UPS. The technician determines that the UPS has failed and replaces it. The technician then separates the power supplies to connect them to two separate UPSs. Which of the following troubleshooting steps did the technician just accomplish?
Options
- AImplement preventive measures.
- BEstablish a plan of action.
- CDocument findings/lessons learned.
- DTest the theory to determine the cause.
How the community answered
(30 responses)- A83% (25)
- B3% (1)
- C3% (1)
- D10% (3)
Explanation
The technician has implemented a preventive measure to avoid the same situation in the future. A plan of action was established way before and consisted in replacing the defective UPS (and possibly already included the change to a double UPS setup).