E_S4CON_2505 · Question #21
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
The correct answer is A. EU_CLONE_MIG_DT_RUN. In the SUM (Software Update Manager) migration repetition approach, SUM stops after EU_CLONE_MIG_DT_RUN because this phase completes the data migration run on the shadow/clone system - at this point the migrated data is available and meaningful functional testing can begin…
Question
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
Options
- AEU_CLONE_MIG_DT_RUN
- BEU_CLONE_MIG_SOT_RUN
- CEU_IMPORT_ALL
- DEU_CLONE_MIG_DT_CREATE
How the community answered
(42 responses)- A88% (37)
- B7% (3)
- C2% (1)
- D2% (1)
Explanation
In the SUM (Software Update Manager) migration repetition approach, SUM stops after EU_CLONE_MIG_DT_RUN because this phase completes the data migration run on the shadow/clone system - at this point the migrated data is available and meaningful functional testing can begin before committing to the irreversible cutover steps.
Why the distractors are wrong:
- B (EU_CLONE_MIG_SOT_RUN): SOT stands for Switch-Over Time - this phase performs the actual system switchover and occurs after the test cycle, not before it.
- C (EU_IMPORT_ALL): This is the standard ABAP software import phase unrelated to the migration repetition test cycle pause; it happens in the main downtime window.
- D (EU_CLONE_MIG_DT_CREATE): This phase only creates the shadow/clone structure - the data migration hasn't run yet, so there's nothing meaningful to test.
Memory tip: Think of it as "Run before Review" - SUM lets you review (test) only after the data migration has fully RUN (DT_RUN). The sequence is: Create the clone → Run the migration → STOP to test → Switch over. The stop always comes right after the RUN, never before or during.