Which action needs to be taken if the Backend Cabling Verification fails after a Data Center relocation?

The correct answer is A. Contact PSE Lab for assistance. See the full explanation below for the reasoning.

Question

Which action needs to be taken if the Backend Cabling Verification fails after a Data Center relocation?

Options

  • AContact PSE Lab for assistance.
  • BRelocate the cables shown as faulted.
  • CReplace the cables shown as faulted.
  • DPower down and re-start the Backend Cabling Verification script.

How the community answered

(50 responses)
  • A
    80% (40)
  • B
    4% (2)
  • C
    6% (3)
  • D
    10% (5)