nerdexam
Dell-EMC

E20-594 · Question #149

E20-594 Question #149: Real Exam Question with Answer & Explanation

Sign in or unlock E20-594 to reveal the answer and full explanation for question #149. The question stem and answer options stay visible for context.

Question

In a Dell EMC Avamar server rack architecture, where are the utility node and two internal switches located?

Options

  • AUtility node is at the bottom of the rack, the two internal switches are at the top of the rack
  • BUtility node is at the top of the rack, the two internal switches are at the bottom of the rack
  • CTwo internal switches are at the top of the rack, the utility node is above the spare node at the
  • DOne internal switch is installed at the top of the rack, with the second switch above the utility node

Unlock E20-594 to see the answer

You've previewed enough free E20-594 questions. Unlock E20-594 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.

Full E20-594 Practice