Dell-EMC
E20-594 · Question #149
E20-594 Question #149: Real Exam Question with Answer & Explanation
Sign in or unlock E20-594 to reveal the answer and full explanation for question #149. The question stem and answer options stay visible for context.
Question
In a Dell EMC Avamar server rack architecture, where are the utility node and two internal switches located?
Options
- AUtility node is at the bottom of the rack, the two internal switches are at the top of the rack
- BUtility node is at the top of the rack, the two internal switches are at the bottom of the rack
- CTwo internal switches are at the top of the rack, the utility node is above the spare node at the
- DOne internal switch is installed at the top of the rack, with the second switch above the utility node
Unlock E20-594 to see the answer
You've previewed enough free E20-594 questions. Unlock E20-594 for full answers, explanations, the timed quiz mode, progress tracking, and the master PDF. Question stem and options stay visible so you can still see what's on the exam.