E20-526 · Question #19
E20-526 Question #19: Real Exam Question with Answer & Explanation
Sign in or unlock E20-526 to reveal the answer and full explanation for question #19. The question stem and answer options stay visible for context.
Question
A customer is considering a six brick dispersed cluster using 3?0U racks. The customer wants advice on racking the InfiniBand switches. Rack 1 (left) contains X-Bricks 1 and 2 Rack 2 (middle) contains X-Bricks 3 and 4 Rack 3 (right) contains X-Bricks 5 and 6 Which recommendation should be provided?
Options
- AInstall the InfiniBand switches in Rack 1 with a 1U placeholder between the switches.
- BInstall an InfiniBand switch in Racks 1 and 3 with a 1U placeholder between the X-Bricks.
- CInstall the InfiniBand switches in Rack 2 with a 1U placeholder between the switches.
- DInstall the InfiniBand switches in Rack 3 with a 2U placeholder between the switches